Project Portfolio Complete Module Guide

Project Portfolio runs a project from opportunity to close in one place: plan the work, estimate and approve the cost, price it with margin guardrails, quote it from Sales, bill it through Accounts Receivable and recognise revenue in the General Ledger. This guide explains every page, workflow, control and setting for project managers, finance teams, sales teams, administrators and auditors.

Version
1.0
Published
23 November 2026
Last updated
23 November 2026

Download the current edition

Version 1.0 is the first edition of the guide and describes the module as shipped in EGKits SaaS V11. The download address stays stable for this edition.

English

English edition

The full reference: lifecycle and stage actions, permissions, settings, planning, estimates, budgets, earned value, pricing, contracts, billing, revenue posting, timesheets, approvals, health scoring, jobs and a page-by-page reference.

PDF16 pages449 KB23 November 2026

Arabic

Arabic edition

The same reference in Arabic, with right-to-left text and Latin left-to-right for routes, settings and identifiers.

PDF16 pages571 KB23 November 2026

Controls the server enforces

  • Project and cost visibility

    People see the projects they own, manage or belong to, or whose portfolio they belong to. Cost figures and cost-based health signals stay hidden from users without cost access.
  • Approval before money moves

    Estimates, budgets, change requests and timesheets are decided once by an approver. With no matching rule, Finance or the manager approves.
  • Margin guardrails

    Prices start from the approved cost. A price below the margin floor or a discount above the limit needs approval before the quotation can go out.
  • Post once

    Billing, revenue and labour journals carry a unique key, so a retry never posts twice. Revenue true-ups post only the difference.

Lifecycle

Opportunity to close

Planning, costing, commercial, contracted, execution and closing. Each stage moves by an explicit action, and a project cannot close while change requests, timesheets or revenue proposals are open.

Control

CPI, SPI and a health score

Earned value is measured against the approved budget, or the estimate when no budget is approved yet. Health starts at 100 and reads On track, At risk or Critical.

Commercial

Quote to invoice in one chain

An accepted quotation creates the contract, milestones and progress bill through Accounts Receivable, and revenue is recognised in the General Ledger.

What the guide covers

Chapters 1–13

  • 1. How to read this guide
  • 2. Executive summary
  • 3. Core concepts
  • 4. Architecture
  • 5. Security and permissions
  • 6. Enabling and setting up
  • 7. Portfolios, programs and intake
  • 8. Project lifecycle
  • 9. Planning and scheduling
  • 10. Cost estimates
  • 11. Budgets and earned value
  • 12. Pricing and quoting
  • 13. Contracts and change orders

Chapters 14–25

  • 14. Billing
  • 15. Revenue recognition and profitability
  • 16. Resources and capacity
  • 17. Timesheets and labour cost
  • 18. Risks, issues and change
  • 19. Approvals
  • 20. Dashboards and project health
  • 21. Background jobs
  • 22. Page reference
  • 23. Troubleshooting
  • 24. Go-live checklist
  • 25. Glossary

Read online

The online user guide walks through each page of the module, and the workflow page draws the status flow of every record: projects, estimates, budgets, quotations and contracts, change requests, timesheets, approvals, billing and revenue.

EGKits publishes this guide to describe the module as shipped in EGKits SaaS V11. It contains no tenant data, credentials or production logs. Screens and limits can change in later releases; the release notes list each change.